Sep 23, 2026
Indonesia breaks ground on 640MW of AI capacity as Thailand moves household solar to a 10GW ambition.
Sep 18, 2026
Indonesia–Singapore power financing, Thai rooftop solar and Vietnam’s project timetable show that delivery still decides.
Sep 16, 2026
ASEAN’s data-centre build is becoming a power-delivery story: Malaysia is putting a 5GW demand figure around the sector, while new generation equipment and green-credit capacity move into place.
Sep 11, 2026
A new Thai power plan, Philippine energy-reform funding and ASEAN AI-compute financing show capital moving—but permits and operating conditions still decide what gets built.
Sep 9, 2026
The Philippines sets out an AI-infrastructure build; Thailand pauses its data-centre pipeline; Visayas reliability gets a recovery timetable.
Sep 4, 2026
MTerra Solar entered commercial operation as grid alerts returned in the Philippines, framing the week’s real question: which capacity is actually ready to deliver?
Sep 2, 2026
Power reliability, project preparation and energy-supply chains moved closer to the real economy this week—from a Visayas red alert to new advisory mandates in Vietnam and the Philippines.
Aug 28, 2026
This week made the terms of ASEAN’s next infrastructure build clearer: capacity announcements are increasingly being tied to the power, networks and capital that make them usable.
Aug 26, 2026
Singapore ties new compute capacity to energy conditions; the Philippines moves critical minerals downstream; Vietnam surfaces site, financing and delivery constraints.
Aug 21, 2026
Capital, power and permissions became the real tests of ASEAN infrastructure execution this week.